Macintosh Foodservice Consultants undertook a comprehensive design consulting service for The Leadenhall Building, a prominent skyscraper in central London, standing at 225-metres tall (738 ft). The project encompassed RIBA stages 2 to 6, focusing on the design development, construction documentation, and project delivery phases to enhance the foodservice facilities within levels 27 / 28 / 29 of the building.
Macintosh collaborated closely with the stakeholders of the Leadenhall Building to understand their unique requirements and objectives for the foodservice facilities. Leveraging their expertise in foodservice design and operations, the team at Macintosh developed a tailored design solution that aligned with the building's architectural aesthetics and the client's vision.
During RIBA stages 2 to 6, Macintosh executed a systematic approach to design development and documentation for the foodservice facilities which involved refining the initial concepts, preparing detailed drawings and specifications, and coordinating with architects, engineers, and contractors to ensure the seamless integration of the foodservice elements within the building, including new kitchens, refreshment points, event space and the social hub.
Macintosh acted as a key collaborator throughout the project, liaising between the various stakeholders to ensure alignment on design decisions, budget considerations, and project timelines. Their proactive communication and project management skills facilitated a smooth workflow and effective implementation of the design solutions.
As part of their consulting service, Macintosh maintained a strong focus on quality assurance and compliance with relevant regulations and standards, conducting regular inspections, quality checks, and reviews to ensure that the foodservice facilities met the necessary safety, hygiene, and operational requirements.
Macintosh’s involvement in the design consulting service for the Leadenhall Building exemplifies their dedication to creating innovative and tailored solutions for their clients. By navigating the complexities of RIBA stages 2 to 6, Macintosh contributed to the successful transformation of the foodservice facilities at the Leadenhall Building and the project stands as a testament to the collaborative effort and creative vision of both parties involved.
Macintosh Foodservice Consultants LTD (Company Number 12338279 )
Copyright © 2024 - All Rights Reserved
Scott House, Suite 1 The Concourse, Waterloo Station London, SE1 7LY